In the process of using Pvc granules for injection molding, many people have encountered product black spots, black lines, and even product yellowing. So what is the reason? Please see below. PVC is a heat-sensitive material, and its injecti...
In the process of using Pvc granules for injection molding, many people have encountered product black spots, black lines, and even product yellowing. So what is the reason? Please see below.
PVC is a heat-sensitive material, and its injection molding processability is poor. The reason is that too high melting temperature or too long heating time can easily decompose PVC. Therefore, controlling the melting temperature is the key to injection molding PVC products. The heat source for melting PVC raw materials comes from two aspects: the shear heat generated by the screw movement to the plastic and the resistance wire heating on the outer wall of the barrel, and the shear heat of the screw movement is the main source. The outer heating of the barrel is mainly the heat source when the machine starts. Due to the poor thermal conductivity of PVC, during the heating process, although the plastic inside and outside the barrel has been heated, the intermediate material is still in a condensed state, and even the outer part has been overheated and decomposed, and there may be unmelted parts inside (therefore PVC injection molding often The appearance of black streaks and black spots is a headache).
All kinds of reasons must be fully paid attention to in the screw barrel product design, mold design, injection molding process, etc. The selection of production equipment is also very important. The following is an introduction to the points that should be paid attention to when injecting PVC, hoping to be helpful to readers.

The following points should be paid attention to in product design and mold design:
1. The product should not have sharp corners or sudden changes, and the thickness should not change much to prevent the degradation of PVC.
2. The mold should have a draft angle of 10 or more, and allow about 0.5% shrinkage.
3. Several points should be paid attention to in mold runner design
a) The injection port of the mold should be slightly larger than the nozzle hole, and larger than the diameter of the staggered part of the main runner, so that the PVC flows into the cavity without stagnation and the pressure is balanced.
b) Use intercept gates as much as possible to prevent molten slag from flowing into the product and the flow channel of the product and reduce the temperature and make it easy to form.
c) The gate should be designed at the thickest wall of the product, and the width is sufficient, the length is preferably between 6-8mm, so that the PVC material flows smoothly.
d). In order to support the pressure drop and easy demoulding, the runner should be round, and the diameter should be selected between 6-10mm according to the product size and weight.
4. The mold temperature should have a cooling water control device, so that the mold temperature can be controlled between 30 ℃ and 60 ℃.
5. The surface of the mold should be smooth and chrome-plated to prevent corrosion.

The following items should be noted in the injection molding process:
1. The back pressure should be controlled at about 1Mpa. Excessive back pressure will produce excessive shearing force and cause the PVC to overheat and decompose. At the same time, multi-stage back pressure control should be used in the melting process. At the beginning, the effective length of the screw is long and the back pressure should be lower. As the effective length of the screw decreases, the back pressure should be appropriately increased to compensate for the decrease in heat. A short period before the end of the return, the back pressure should be reduced to prevent salivation leakage.
2. The screw speed should vary depending on the diameter. Generally, if the diameter is less than 60mm, the speed is 50-70rpm; if the diameter is more than 70mm, the speed is 20-50rpm to prevent PVC degradation due to excessive shearing force.
3. In order to make the plastic injection into the inspection cavity, the speed of each place is uniform. Generally, the injection speed should be controlled in multiple stages. The principle is to start the injection slowly. With the gradual increase of the molding area, the injection rate must be increased until there are no cracks and shrinkage marks. , Do not inject too fast to prevent the product surface from becoming eroded.
4. The temperature of the barrel during the injection should be controlled between 170-190℃. When the temperature of the barrel reaches the set temperature, the blower should be started to cool down, and when the temperature needs to be raised, the blowing and heating should be stopped to prevent the PVC from overheating and deterioration.

Due to the special properties of PVC, special PVC injection molding machines are used for production. The following points should be noted:
1. The screw length to diameter ratio should be 20:1, and the compression ratio should be between 1:1.6-1:1.2.
2. The screw and nozzle should be specially made of PVC with chrome-plated surface.
3. The injection pressure, speed, back pressure and temperature can be controlled in multiple stages and precisely.

Finally, the following requirements should be paid attention to in the preparation of raw materials:
1. It must be avoided that other plastic PVC raw materials cause deterioration of PVC raw materials. Especially when other raw materials have been injected, the plastic in the barrel and screw must be cleaned before injection of PVC products. (Clean the screw and barrel with PS material)
2. Before stopping the machine, the Pvc granules must be completely cleaned. If the machine is stopped for a long time, to prevent the PVC from corroding the machine, use PS material to clean the screw and barrel.
3. When the Pvc granules are stored for more than 6 months and the environment is hot and humid, they should be dried at 60-80℃ for 1-2 hours before use.
大粗鳮巴r教师人妻91| 亚洲乱码专区一区二区三区四区| 蜜桃av噜噜一区二区三区免费| 美女大骚逼幸福遍穴| 九九热在线精品免费看| 怎么样操女人的逼亚洲Av黄片段| 高颜值情侣鸡巴插插淫叫| 欧美一区二区高清视频在线观看| 从后面进入嗯啊视频| 精品免费福利片国产| 久久久五月性色视频| 新视觉亚洲三区二区一区理伦| 无码爆一二三区免费视频| 日韩av一区二区高清不卡| 女人被躁到高潮嗷嗷叫小| 色婷婷五月综合久久| 无遮挡粉嫩久久久久久久| 白虎嫩穴抠逼高潮| 中文字幕一高清免费视频| 成人国产亚洲精品一区二| 日本精品高清在线观看| 国产欧美亚洲一区二区三| 狂野国产性爱av| 极品 操 抽插视频| 女生小穴色色视频| 国产精品操大屁股老淑女| 国产无圣光一区福利二区| 深插巴西美女的逼| 伊人网在线免费视频| 看小伙草白女人比的黄片| 91在线一区二区| 91久久高清国语自产拍| 大鸡巴抽插小穴色虐视频| 视频在线观看一区@99| 国产精品毛片无遮挡高清| 国产亚洲精品高清视频免费| 国产精品亚洲一区二区三区极品| 精品区在线导航视频观看| 大香蕉中码手机在线视频| 国产欧美日韩一区二区在线观看| 伊人久久亚洲婷婷综合久久|